You need to upgrade your Flash Player

Modified or Added since December 15th, 2008
Below are the most current conditional use documents – click links to display or download PDF files

Sheet#
(Go to page)
Description

Brief Description
of Changes

   
HL.2 1/7/2009: Key retaining wall heights were added and notes were changed to reflect council approval.
P.16 1/7/2009: Clarifications were added.
A.17 1/17/2009: Created.
A.18
Mitigators (2MB PDF)
1/17/2009: Created.
A.19/List 1/28/2009: Sent.
A.7 1/28/2009: Revised/Completed.
BP.01 1/29/2009: Enhanced project borders. Revised for Charlie Wintzer.
S.1 1/29/2009: Lengthened sections. Revised for Jack Thomas.
S.2 1/29/2009: Lengthened sections. Revised for Jack Thomas.
S.3 1/29/2009: Lengthened sections. Revised for Jack Thomas.
S.4 1/29/2009: Lengthened sections. Revised for Jack Thomas.
S.5 1/29/2009: Lengthened sections. Revised for Jack Thomas.
S.6 1/29/2009: Lengthened sections. Revised for Jack Thomas.
S.7 1/29/2009: Lengthened sections. Revised for Jack Thomas.
S.8 1/29/2009: Lengthened sections. Revised for Jack Thomas.
S.9 1/29/2009: Lengthened sections. Revised for Jack Thomas.
A.6 1/29/2009: Revised/Completed.
A.18
Mitigators (2MB PDF)
2/10/2009: Revised.
A.3/List 2/10/2009: Created.
A.19/List 4/2/2009: Sent.
P.1
Level 1 Use Plan (379KB PDF)
4/7/2009: Revised.
P.2
Level 2 Use Plan (353KB PDF)
4/7/2009: Revised.
P.3
Level 3 Use Plan (376KB PDF)
4/7/2009: Revised.
P.4
Level 4 Use Plan (380KB PDF)
4/7/2009: Revised.
P.5
Level 5 Use Plan (455KB PDF)
4/7/2009: Revised.
P.6
Level 6 Use Plan (432KB PDF)
4/7/2009: Revised.
P.7
Level 7 Use Plan (459KB PDF)
4/7/2009: Revised.
P.8
Level 8 Use Plan (468KB PDF)
4/7/2009: Revised.
P.9
Level 9 Use Plan (473KB PDF)
4/7/2009: Revised.
P.10
Level 10 Use Plan (475KB PDF)
4/7/2009: Revised.
P.11
Level 11 Use Plan (470KB PDF)
4/7/2009: Revised.
P.12
Level 12 Use Plan (468KB PDF)
4/7/2009: Revised.
P.13
Level 13 Use Plan (462KB PDF)
4/7/2009: Revised.
P.14
Level 14 Use Plan (431KB PDF)
4/7/2009: Revised.
P.15
Level 15 Use Plan (432KB PDF)
4/7/2009: Revised.
P.16 4/7/2009: Revised.
10 PEC Walkability Study 033109 (312KB PDF) 4/10/2009: Added.
11 Alta Engineering Traffic & Walkability Improvements 040209 (850KB PDF) 4/10/2009: Added.
11 Alta Engineering Traffic & Walkability Improvements Letter 040209 (850KB PDF) 4/16/2009: Revised.
12 Alta Engineering Traffic & Walkability Improvements Drawings 040209 (List) 4/16/2009: Added.
CP.01 4/16/2009: Added.
CP.02 4/16/2009: Added.
CP.03 Lowell Improvements 3(524KB PDF) 4/16/2009: Added.
CP.04 Lowell Improvements 4 (92KB PDF) 4/16/2009: Added.
CP.05 Lowell Improvements 5 (500KB PDF) 4/16/2009: Added.
CP.06 Lowell Improvements 6 (252KB PDF) 4/16/2009: Added.
CP.07 Lowell Improvements 7 (572KB PDF) 4/16/2009: Added.
CP.08 Lowell Improvements 8 (568KB PDF) 4/16/2009: Added.
CP.09 Parking Analysis (716KB PDF) 4/16/2009: Added.
CP.10 Quarter Mile Exhibit (832KB PDF) 4/16/2009: Added.
10 PEC Walkability Study 033109 (848KB PDF) 4/16/2009: Revised.
A.18
Mitigators (2MB PDF)
4/23/2009: Revised.
A.20 4/23/2009: Added.
A.20 Thinking Outside the Box (2MB PDF) 5/11/2009: Revised.
10 7/16/2009: Revised.
14 PEC Traffic Report Addendum 5 Parking 061809 (3.1MB PDF) 7/16/2009: Added.
15 7/16/2009: Added.
16 Perkins Sketches - Lowell & Empire 062509 (3.9MB PDF) 7/16/2009: Added.
17 7/16/2009: Added.
presentations Traffic Presentation 7.22.2009 7/16/2009: Added.
 
 
     
 
 
     
 
 
     
 
 
     
 
 
     
 
 
     
 
 
     
 
 
LOGIN ©2002 MPE, INC. All rights reserved. | Designed by Lormik Promotions